Activities in a Construction Project

video-placeholder
Loading...
シラバスを表示

学習するスキル

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

レビュー

4.8 (1,844 件の評価)

  • 5 stars
    79.93%
  • 4 stars
    17.35%
  • 3 stars
    2.16%
  • 2 stars
    0.32%
  • 1 star
    0.21%

GV

2020年9月9日

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

T

2022年4月10日

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

レッスンから

Types of Construction Activity Relationships

This module provides an overview of the types of construction activity relationships encountered in a construction project and how to represent them in an activity precedence diagram.

講師

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

コース一覧で検討

サインアップは無料です。今すぐサインアップして、パーソナライズされたお勧め、更新、サービスを利用しましょう。