Linear Construction Overview and Examples

video-placeholder
Loading...
シラバスを表示

学習するスキル

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

レビュー

4.8 (1,838 件の評価)

  • 5 stars
    80.03%
  • 4 stars
    17.30%
  • 3 stars
    2.17%
  • 2 stars
    0.32%
  • 1 star
    0.16%

VT

2019年12月23日

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

T

2022年4月10日

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

レッスンから

Linear Construction Operations and Line of Balance

Professor Odeh introduces linear construction; projects that have linear, or repetitive, properties. Also covered is the Line of Balance scheduling method which is a way of allocating resources for repetitive processes.

講師

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

コース一覧で検討

サインアップは無料です。今すぐサインアップして、パーソナライズされたお勧め、更新、サービスを利用しましょう。