Risk Allocation and Planning for Scheduling Overview

video-placeholder
Loading...
シラバスを表示

学習するスキル

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

レビュー

4.8 (1,842 件の評価)

  • 5 stars
    79.96%
  • 4 stars
    17.37%
  • 3 stars
    2.17%
  • 2 stars
    0.32%
  • 1 star
    0.16%

GV

2020年9月9日

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

VT

2019年12月23日

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

レッスンから

Risk Allocation and Planning

Dr. Eduardo Gamez, Deputy Director of Risk Management for AECOM, introduces Risk Allocation and Planning. Dr. Gamez discusses the importance of formal risk management and how to use risk assessment as a support tool for planning and scheduling.

講師

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

コース一覧で検討

サインアップは無料です。今すぐサインアップして、パーソナライズされたお勧め、更新、サービスを利用しましょう。