Technology Applications: Getting Started

video-placeholder
Loading...
シラバスを表示

学習するスキル

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

レビュー

4.8 (1,841 件の評価)

  • 5 stars
    80.01%
  • 4 stars
    17.32%
  • 3 stars
    2.17%
  • 2 stars
    0.32%
  • 1 star
    0.16%

T

2022年4月10日

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

GV

2020年9月9日

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

レッスンから

Technology Applications for Scheduling

Dareen Salama, of the STV Group, discusses the technology applications used for scheduling. Dareen provides an overview of the applications used for scheduling development, schedule analysis, sharing and collaboration and visualization.

講師

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

コース一覧で検討

サインアップは無料です。今すぐサインアップして、パーソナライズされたお勧め、更新、サービスを利用しましょう。